# 093-kpi-status: KPI status Goal: record fleet KPI state Steps: 1. Run box kpi status. 2. Record spend/limit health; flag breaches. Done criteria: result notes list status or exact error. Done criteria: result notes appended below; file moved to done/. Result notes (append below before moving to done/): Completed 2026-10-08T08:40:42Z via box tasks done: KPI 2026-10-08: all 6 nodes ONLINE, no breaches. Quota: muse/pip/opm 100pct, 646 Active, dev 39pct, def 31pct. Calls(valid): muse 156(155v), pip 40(29v), 646 576(511v), opm 2786(2089v), dev 2(1v), def 0. Subagents: 646 has 3 (was 2 at 083). Tmux: muse 2. Efficiency HIGH muse/646/opm, MODERATE pip, LOW dev/def. vs 083: activity ticked up, no concerns.